Ship by Rail

Move more. Reach farther. Build the rail plan around the freight.

Explore direct rail, transload, equipment, commodity, location, and development options across the WNYP system in New York and Pennsylvania — even when the current facility does not have a siding.

Direct rail service Rail-to-truck transload Rail-served properties Norfolk Southern connection New York & Pennsylvania
Start With the Freight

The right question is not simply, “Can this move by rail?”

A workable rail program connects the commodity, lane, annual volume, equipment, facility, loading and unloading method, service expectations, inventory strategy, and commercial arrangement.

WNYP can help determine whether direct rail, an existing transload facility, a rail-served property, or a future track connection deserves a closer look.

Early information does not need to be perfect. Share the best volume, lane, payload, facility, and timing estimates currently available, then refine the plan with the railroad.
Where Rail Often Deserves a Closer Look

Rail is strongest when the freight and operation create a repeatable opportunity.

No single factor guarantees a good fit. These conditions usually justify a more detailed lane, equipment, and facility review.

01

Repeatable volume

Consistent or seasonal truckload demand can create enough freight to support railcar-scale movements and inventory planning.

02

Meaningful line-haul distance

Rail becomes more relevant when the long-haul portion is substantial and truck mileage can be concentrated around the ends of the move.

03

Dense, bulky, or specialized freight

Heavy materials, dry bulk, liquids, dimensional products, and repeat industrial inputs often align with railcar capabilities.

04

Facility and inventory flexibility

Rail can support larger receipts, planned inventory, transload staging, or customer-controlled loading and unloading windows.

Three Paths to Rail

The current facility does not have to determine the long-term answer.

Select the access path that most closely matches the project today.

01 / Direct Rail Service

Use existing track at the shipper or receiver.

Direct service can reduce intermediate handling and give the facility more control over loading, unloading, inventory, and railcar cycle. WNYP still needs to evaluate track condition, capacity, clearances, commodity, equipment, and service requirements.

02 / Rail Without a Private Siding

Use rail for the long haul and truck for the local connection.

Transload can provide a practical path when the shipper, receiver, warehouse, or job site is not located on track. The right facility depends on the commodity, equipment, handling method, storage, truck radius, route, and operating plan.

Commodity Explorer

Start with what you move and how it must be handled.

Search or filter the commodity groups below. Equipment examples are general planning references; the actual car, route, handling system, and service must be confirmed for the specific product and lane.

AG Commodity solution

Agriculture, Feed & Fertilizer

Grain, oilseeds, feed ingredients, pellets, meals, crop nutrients, and other agricultural inputs.

Common equipment
Covered hoppers, tank cars, boxcars
Evaluate
Seasonality, product integrity, storage, truck radius, unloading rate
Explore Ag & Feed →
FD Commodity solution

Food Ingredients & Sugar

Liquid sweeteners, edible oils, dry ingredients, packaged products, and other food-manufacturing inputs.

Common equipment
Tank cars, covered hoppers, boxcars
Evaluate
Food-grade handling, cleaning, temperature, contamination control
Explore Food Logistics →
STL Commodity solution

Steel & Industrial Metals

Coils, plate, structural shapes, billets, bar, fabricated products, scrap, and dimensional industrial loads.

Common equipment
Gondolas, flatcars, coil cars, boxcars
Evaluate
Securement, crane access, weight distribution, weather protection
Explore Steel & Metals →
CM Commodity solution

Construction Materials

Aggregates, cement, fly ash, slag, wallboard, lumber, panels, and other building materials.

Common equipment
Open hoppers, covered hoppers, centerbeams, boxcars
Evaluate
Job timing, unloading method, staging, truck access, seasonal demand
Explore Construction →
PL Commodity solution

Plastics & Resins

Pellets, powders, additives, packaged resin, and other polymer or plastics-manufacturing inputs.

Common equipment
Covered hoppers, boxcars
Evaluate
Product cleanliness, pneumatic unloading, storage, inventory visibility
Explore Plastics →
PP Commodity solution

Paper, Pulp & Packaging

Rolls, pulp, recycled fiber, linerboard, packaging materials, and finished paper products.

Common equipment
Boxcars, flatcars, centerbeams
Evaluate
Moisture protection, loading pattern, warehouse access, damage prevention
Explore Paper & Packaging →
SB Commodity solution

Sand, Minerals & Dry Bulk

Industrial sand, specialty minerals, proppants, aggregates, and other dense bulk commodities.

Common equipment
Covered hoppers, open-top hoppers
Evaluate
Density, unloading rate, dust control, storage, project demand
Explore Sand & Bulk →
LQ Commodity solution

Energy, Chemicals & Bulk Liquids

Propane, petroleum-related products, chemicals, liquid fertilizer, and other regulated or specialized bulk liquids.

Common equipment
Commodity-specific tank cars
Evaluate
Product classification, permits, containment, transfer systems, emergency planning
Discuss a Liquid-Bulk Project →
No commodity groups match the current search and filter. Products not listed may still be suitable for review. Discuss It With Us →
From Freight Question to Operating Plan

A rail opportunity becomes real through coordinated commercial and operating work.

01

Define the freight

Commodity, origin, destination, annual volume, truck payload, frequency, timing, and current pain point.

02

Evaluate access

Existing siding, transload location, rail-served property, track extension, or new development site.

03

Confirm equipment & handling

Railcar type, expected net load, loading and unloading systems, securement, storage, and readiness.

04

Develop route & commercial path

Norfolk Southern interchange path, rate structure, fuel surcharge, and accessorial terms.

05

Prepare for service

Agreements, credit, operating instructions, equipment supply, safety, approvals, and startup coordination.

What to Send Us

Six inputs are enough to begin a useful conversation.

Estimates are acceptable at the beginning. More detail helps the railroad narrow the route, equipment, access, and commercial questions more quickly.

01
CommodityProduct description and STCC when available.
02
Origin & destinationFacilities, cities, railroads, supplier, or customer locations.
03
Annual volumeTons, truckloads, railcars, seasonality, and growth.
04
Current truck payloadNet tons or pounds per truck and existing pattern.
05
Facility & handlingTrack access, unloading, storage, utilities, and truck access.
06
Timing & objectiveStartup, project status, service need, cost issue, or capacity goal.
Freight Planning Tools

Use the tools to prepare the conversation — not replace project-specific review.

Equipment & volume

Railcar Guide & Freight Estimator

Compare common equipment, understand load limits, estimate annual railcars from truck volume, and convert freight units.

Launch the Guide →
Access & locations

Properties & Transload Map

Compare facilities, rail-served sites, capabilities, highways, utilities, service territories, and market reach.

Explore Locations →
Network & routing

Rail Services

Review WNYP service capabilities, storage, transload, tariff information, and development support resources.

Explore Rail Services →
Request a Freight Review

Bring us the freight question. We’ll help identify the practical rail path.

Contact the WNYP business development team to discuss a lane, commodity, transload opportunity, rail-served property, track connection, equipment need, storage request, expansion, or new industrial project.